| PORTFOLIO |

Mobil Trinidad and Tobago Petroleum Inc. |
| |
- Offshore
Base Operation for exploration drilling of
two (2) wells during the period October 1991
to April 1994
|
 |

EOG Resources Trinidad Ltd. |
| |
- Offshore
Base Operation for exploration drilling during
the period April 1993 to April 1994
- Offloading,
staging and delivering of pipes and equipment
as requested
- Shore
Base Facilities for the laying of EOG’s
16” Pipeline during the period of September
2001
|
 |
All Seas Engineering |
 |
- Staging
and offloading pipes for the laying of BP
Amoco 36” Gas Line from October 1995
to December 1995
- Shore
Base Facilities and Services for the laying
of British Gas 24” Pipeline Project
to All Seas September 2001
- Operating
base for the 16” Gas Pipeline for EOG
Resources
- Shorebase
supply services for the M/V Solitaire for
the BP Bombax 48” Gas Line
|
 |

British Gas International |
| |
- Receiving,
staging and delivery of Pipes and Oilfield
Equipment
- The
24” Gas Line Project was operated out
of Chagterms September 2001
|
 |

Exxon Exploration and Production Trinidad Ltd |
| |
-
Shore Base Facilities provided to Exxon Exploration
and Production Trinidad Ltd. for a period
of three (3) years: August 2000 to July 2003
|
 |
 |
Esner Corporation
-
Shore Base Facilities for exploration drilling
in Venezuela from May to July 1998
|
 |

Sundowner Trinidad Inc. |
| |
-
Staging and docking facilities for the upgrading
of Sundowner’s Rig for use in BP Amoco’s
walkover fields from April 2000 to June 2000
|
 |
|
CGX Energy Inc. |
| |
-
Shore Base Facilities provided for exploration
drilling in Guyana from May 2000 to July 2000
|
 |

J. Ray Mc Dermott Inc. |
| |
-
Shore Base Facilities for the laying of BP
Amoco’s 36” Gas Line from December
1997 to August 1998
|
 |

Global Marine/GlobalSantaFe |
| |
-
Shorebase support for Rig “Glomar Labrador
1” for its upgrades and repairs
- Shorebase
support for Rig “Glomar Baltic 1”
for its upgrade and repairs
- Open
and covered warehouse, lifting equipment,
roustabouts, electrical supply, potable water,
garbage disposal, diesel oil, offloaded foreign
vessels with supplies for the upgrades, etc.
|
 |

BPTT LLC |
 |
Cannonball
Project
-
Storage of pipes.
- Loading
out of pipes.
- Shorebase
services for pipe laying project.
- Storage
of platform at dock.
|
Bombax
Project
-
The Sub Sea Manifold, fabricated by Damus
on site at ChagTerms
- Completed
within approx. 160,000 man hours
-
Dims. – 60’ x 60’ x 25’
-
Weight – 400 MT
-
First of its kind to be built in T&T
-
BPTT’s largest offshore structure
-
CalDive contracted to install the spool pieces
and manifold
|
|
 |
Kapok
Project
-
Bridge and Flareboom fabricated by Damus on
site at ChagTerms
- Loaded
out by Heerema
BP
Trinidad Limited
-
Docking Facilities, Labour and Equipment to
BP’s Offshore Supply Vessels for of
delivering and receiving stores
- Provided
drill and potable water and garbage disposal
-
From December 1999 to June 2000 BP’s
Shorebase Facilities for Deepwell exploration
-
The Rig “Glomar Labrador 1” was
berthed alongside Chagterms from 31st August
to 18th October 2001 for Shore Base Service
|
 |
|
|
|
 |
|
|